|
|
|
 |
This site was the largest, with steep, eroded banks reaching 6 feet above the waters edge. We tried stacking the biologs to give us a better bank slope to work with in establishing vegetation. So far this has been very effective. There are 5 barbs on this stream bend, which showed positive channel response within a few months of installation.
|
|

Banks were compacted from the streams edge to the road - about 20 feet. |
 |
|
|
|
|