This site was the largest, with steep, eroded banks reaching 6 feet above the water’s edge. We tried stacking the biologs to give us a better bank slope to work with in establishing vegetation. So far this has been very effective. There are 5 barbs on this stream bend, which showed positive channel response within a few months of installation.

Banks were compacted from the streams edge to the road - about 20 feet.
Banks were compacted from the streams edge to the road - about 20 feet.