|
|
 |
|
 |
Barbs were placed along the channel in five locations and jute net, tree revetments, plants, and seed were all applied to the banks. |
 |
|
 |
Because of the bank height, biologs were stacked. This allowed a more stable angle established after the banks were broken and sloped behind the biologs. |
|
 |
|
|